0000025997 00000 n Electrical Permit Information - michigan.gov Job Location HOMEOWNER CONTRACTOR Name of Owner Has a building permit been obtained for this project? For a better experience, please enable JavaScript in your browser before proceeding. to different temperatures and where condensation is Cables cannot be embedded in poured concrete, cement or aggregate or located in hazardous or classified locations, except where expressly permitted by other articles in the MEC. This requirement does not apply to upgrades, new service connections or other planned modifications. Despite the name, pole barns are not only used on farms. Actual barns are used in agriculture, but the pole barn style can be used in other commercial buildings and sometimes for homes. Pole barns and buildings are known for being inexpensive and easy to erect. Is it an ag building, or just a residential shed/garage? The Eaton County Department of Construction Codes is dedicated to providing the best services possible. WebR301.1 Design. Single conductors shall be used only where part of one of the recognized wiring methods listed in Table E3801.2. material, such as tape or sleeving, that is listed or listed Bonding jumpers must connect to metallic pipes or fittings between a delivery point and the initial downstream CSST fitting and must not be smaller than 6 AWG copper wire or an equivalent size. One or more grounding electrodes if the conductor or bonding jumper sizes are adequate. and all building code requirements. Paulos passion for SEO has led him to stay up-to-date on the latest trends and best practices, ensuring his clients receive the most effective strategies to improve their search engine rankings and drive traffic to their websites. 0000007271 00000 n 2 x 4 Pressure Treated Floor Joists 12 on Center. 11350480015 | Il marchio e regolarmente registrato, e tutti i contenuti sono di proprieta esclusiva della Studio Clarus. Department of Construction Codes | Eaton County, MI A permit copy shall be readily accessible or posted at the worksite or held by the permit holder. It also covers conductors connecting to the electrical supply, as well as outside conductors on a property. The code official will retain records by: The authority with jurisdiction shall establish and issue permits, approvals, certificates, notices or orders of electrical safety hazards. Battle Creek, MI. The Eaton County Department of Construction Codes responsibility is to inspect the work and verify its compliance with the code. Add schema markup and improve search visibility. tel:(810) 484-0970 Electrical Codes Pole barn wiring twoply Mar 7, 2018 twoply Registered User Joined Jan 6, 2016 Messages 58 Location North America Mar 7, 2018 #1 Hey everyone, Per the MEC, type NM (Romex), type NMC and type NMS cables can be used in: Cables must be hidden within floors, walls and ceilings with a thermal barrier of material that has a minimum 15-minute finish rating, according to listings of fire-rated assemblies in the Michigan Building Code. 0000010817 00000 n WebThe Michigan Building Code controls all matters concerning the construction, alteration, addition, repair, removal, demolition, use, location, occupancy, and maintenance of all buildings and structures and their service equipment. The permit holder must ensure that the plans and specifications that the enforcing agency approves or a certified copy of them are accessible on the job site for the enforcing agency. Michigan Pole Barns | Michigan Garage Builders (810)484-0970 %PDF-1.5 % arranged to prevent damage to the enclosed conductors or to, The interior of enclosures or raceways %PDF-1.4 % Buildings with construction permits dated after the Code's adoption must comply with its requirements. Manage local business listings & citations. The insulated conductors under the metallic covering Apr 20, 2019. Michigan Pole Barns 0 Meet Paulo Pessanha, an experienced SEO professional based in San Diego, California. integral bushed opening shall be installed on the end of a conduit installed underground shall be considered to be a wet Circuit grounding conductor energizing the piping system. No permit will exceed 180 days, but the authority may grant one extension of 180 days upon a permittee's presentation giving an acceptable reason for their failure to start or complete the work or activity the permit authorizes. michigan.gov 0000013518 00000 n Construction plans, drawings and specification reviews for electrical systems. Our commitment is to provide clear, original, and accurate information in accessible formats. Maximum support distance in inches from box or other terminations. They cannot be used in theaters, motion picture studios, storage battery rooms, elevators or escalators, or hoistways. Bushings shall be provided where entering a box, fitting, or enclosure unless the box or fitting is designed to afford equivalent protection. rays of the sun shall be listed or listed and marked, as We perform original research, solicit expert feedback, and review new content to ensure it meets our quality pledge: helpful content Trusted, Vetted, Expert-Reviewed and Edited. The numbering system used in this Code is the same system used in many state and municipal codes. The department is open to the public from 8:00 AM to 4:30 PM, Monday through Friday. Type USE cable not permitted above ground except to terminate at the exterior of a building in an. endstream endobj 20 0 obj <> endobj 21 0 obj <> endobj 22 0 obj <>stream Reviewed by Michelle Seidel, B.Sc., LL.B./JD, MBA. Section 2. They shall not conceal any equipment until the electrical inspector approves it. Michigan Residential Electrical Building Codes | Legal Code An electrical permit application must be submitted to the appropriate enforcing agency. Alteration, installation or repair of electrical equipment and wiring installed to operate audio/video signals or data transmission. The Plug-In Outlet Tester This is the first tool I grab to troubleshoot a problem with outlet circuit wiring. JavaScript is disabled. Call (517) 543-3004 or visit www.eatoncounty.org for more details. However, this attention to detail often gets lost if the homeowners go on to add Lesser depths shall be permitted where cables and conductors rise for terminations or splices or where. 32 0 obj <>/Filter/FlateDecode/ID[<1927D22E680A034890D12105B553A33D>]/Index[19 24]/Info 18 0 R/Length 74/Prev 24920/Root 20 0 R/Size 43/Type/XRef/W[1 2 1]>>stream Attachment points on bonding jumpers must be accessible. The manufacturing, repairing, servicing or testing of electrical equipment or apparatus. By taking some of the following into consideration, one can safely wire electricity to a newly built pole barn or garage. Not every barn or garage will require the same amount of energy. If a pole barn or garage simply needs energy to power overhead lights, minimal energy is needed. WebCrawford County Michigan Building and Safety Department of Building and Safety Building Forms & Permit Appications You must have Adobe Acrobat Reader to open and read these files. A bushing, or terminal fitting, with an WebElectrical: Tim Taylor, Tuesday & Thursday Plumbing / Mechanical: Gerald Antor, Monday & Wednesday 22054 Professional Drive, Suite A Reed City, MI 49677 (231) 832-6117 [email protected] Open Monday through Friday, 8:00 a.m. to 4:30 p.m. An individual shall not place electrical conductors or equipment in a structure or alter, change or add electrical conductors or equipment without a permit to do the work. Il "bonus pubblicit" stato prorogato per il 2021 e per il 2022: come funziona e quali novit sono state introdotte? Securely fastened bushings or grommets shall be provided to protect wiring run through openings in metal framing members. Hb```f``d`e`` ,l@Ip_n:79=&qqtd$`4j9N@LtxL#UHBV&]"PIP1Q]!}`CHzbC@g A I 2J00(XP9c#V b%%p-pb: hL Connections or splices in an conductors or cables emerge as a direct burial wiring method. 0000016174 00000 n It, in turn, is based on the National Electrical Code (NEC). Where used in the code, "authority having jurisdiction" means the enforcing Phone: 231 533 8373. [email protected]. We are incredibly worried about the state of general information available on the internet and strongly believe our mission is to give voice to unsung experts leading their respective fields. Two and one-half feet where used for service or outdoor feeder and 4.5 feet where used for. 0000003797 00000 n Location. The Michigan Electrical Code (MEC) applies to the following: Electrical installation inspections. Call for a quote (810) 484-0970 . Electrical wiring to new pole barn question One- and two-family dwelling units with attached or detached garages and storage buildings, as well as multifamily structures regardless of type of construction. Inspectors cannot advise anyone on how to do the work or solve any problems with the building construction, electrical wiring, plumbing or mechanical systems. 0000004060 00000 n Electrical Wiring for a Workshop 15 amp. His commitment to providing exceptional SEO services has earned him a reputation as a top performer in the industry. This popular tester is also used by most inspectors to test for power and check the polarity of circuit wiring. hmo0^d~ HU$mJkNK@~l Replacement of lamps and utilization equipment for connection to permanently installed receptacle outlets. When completing an electrical equipment installation under a permit, the person, firm or corporation installing the equipment shall notify the electrical inspector in the jurisdiction of the property. A7: Please refer to the chart shown below, as the width of the pole barn determines the required size of the cement pad. R 408.30809 80.13. known to be a problem, as in cold storage areas of buildings Five feet for trade sizes greater than 1 inch. material shall not be placed in an excavation where Always ask to see their license and verify it by using the link to the State of Michigan licensing verification website listed under Helpful Links in the column on the left side of this page. The chief electrical inspector or the authority with jurisdiction may also: A Code official or authority with jurisdiction has the power to enforce Code provisions. The Code, as it is called in the Great Lakes state, applies to general electrical work in residential buildings and other structures. I'm in the planning stages of building a new pole barn and have an electrical question. When the inspection official finds that the installation conforms to the Code, state statutes and local ordinances, they will issue final approval. Alteration, installation, rebuilding, remodeling or repairing of dumbwaiters, elevators, escalators or man lifts carried out under a permit issued by an elevator inspection agency. 0000004749 00000 n Bushings and grommets shall remain in place and shall be listed for the purpose of cable protection. to Build a Pole Barn Studio Clarus2023-02-28T09:03:05+00:0028 Febbraio 2023|, La domanda per accedere al credito dimposta previsto dallagevolazione [], Studio Clarus2021-05-04T06:44:46+00:008 Gennaio 2021|. Liquid-tight flexible nonmetallic conduit without integral reinforcement within the conduit wall shall not exceed 6 feet in length. Crawford County Michigan Rigid Nonmetallic Conduit (RNC): NEMA TC2 and UL 651, Schedule 40 or 80 PVC. Michigan Building Code Archives - Hansen Buildings WebElectrical Permit Application Antrim County Building Department P.O. 0000001753 00000 n Michelle Nati is an associate editor and writer who has reported on legal, criminal and government news for PasadenaNow.com and Complex Media. PVC and ABS Plastic Utilities Duct Fittings: NEMA TC9. If a pole barn or garage simply needs energy to power overhead lights, minimal energy is needed. On the other hand, if the newly erected pole barn will be used as living quarters or a place to use power tools, amp usage will undoubtedly be high. To find out how many amps needed for your application, divide the wattage by the voltage. E3802.2.2 Cable Installed Through or Parallel to Framing Members, E3802.3.2 Protection From Physical Damage, E3802.3.3 Locations Exposed to Direct Sunlight, E3802.4 In Unfinished Basements and Crawl Spaces, E3802.6 Raceways Exposed to Different Temperatures, E3802.7 Raceways in Wet Locations Above Grade, Section E3803 Underground Installation Requirements, Rigid polyvinyl chloride conduit (Type PVC), Run exposed and subject to physical damage, Where run parallel with the framing member or furring strip, the wiring shall be not less than 1, Bored holes in framing members for wiring shall be located not less than 1, Where installed in grooves, to be covered by wallboard, siding, paneling, carpeting, or similar. materials, cinders, large or sharply angular substances, or corrosive such materials cause damage to raceways, cables or other Shall be listed as "sunlight resistant" where exposed to the direct rays of the sun. 0000016196 00000 n It is illegal for anyone to remove the notice, reconnect the electrical supply or use electrical equipment until the issue has been remedied to the authority's satisfaction. 0000010795 00000 n Please call 517-543-3004 to request an inspection. Code shall be maintained in the office of Corporation Counsel and the office of the County Clerk, where it shall remain for public use and inspection. Current Code Effective July 11, 2014 2010 ASME A17.1 Safety Code for Elevators and Authority. Usually it is just overhead lights and minimum number of GFI receptacles, Mechanical, Electrical and Plumbing - MEP. Request plans and specifications to ensure compliance. the raceway or sleeve shall be filled with an, Where 0000002989 00000 n Spread footings shall be at least 6" in thickness. Conduits or raceways shall be WebPOLE BUILDING STYLE HOUSE REQUIREMENTS. rigid metal conduit, intermediate metal conduit, electrical Other towns may only require special permission if the building exceeds a certain size. Before building a pole barn home as a DIY project, it is smart to check with your town or city to find out what permits are required. Follow these guidelines in order to adhere to the building codes in your town. underground installation shall be, Underground cable and conductors Si prega di riprovare o di contattarci all'indirizzo [email protected], Accesso al bonus pubblicit 2023 dal 1 marzo. 0000018823 00000 n Instead of a single permit for each installation or alteration, the authority shall issue an annual permit to an individual or company regularly employing at least one employee for the alteration, installation and maintenance of equipment on a property owned or occupied by the applicant. With over 23 years of experience in the industry, Paulo has become a trusted expert in the field of search engine optimization. #1. To learn more about their pole barns for farmers and contractors, visit the website. 2 Covered Lights, Switch, Receptacle. (, Wiring methods shall be installed and supported in accordance with Table E3802.1. that are not encased in, Direct buried conductors SCMCCI - South Central Michigan Construction Code Inspections trailer << /Size 100 /Info 62 0 R /Root 65 0 R /Prev 93354 /ID[<3c2da823cd2d98fabe2aa64374ebe86d><3e86f4b8f5ad82704a17265524f15ca3>] >> startxref 0 %%EOF 65 0 obj << /Pages 59 0 R /Type /Catalog /PageLabels 57 0 R /Metadata 63 0 R >> endobj 98 0 obj << /S 306 /L 399 /Filter /FlateDecode /Length 99 0 R >> stream Replacement of snap or flush switches, wall switches, lamp sockets, fuses and receptacles, and other minor repair or maintenance work. Electrical services; Plumbing services; Steel Barns Horse In The State Of Michigan. [300.5(C) Exception No.2]. She holds a B.A. The metallic covering is impervious to moisture. Require the exposure of electrical work for inspection if it has been covered or concealed. This position qualifies for a $1,500 signing bonus and a $250 per month retention bonus after completion of 6 months of employment through January 31, 2023. Si verificato un errore nell'invio. State law prohibits unlicensed persons from acting as a contractor and using them limits the recourse you have if the project doesnt go as planned. raceways are installed in wet locations above, Underground service conductors ELECTRICAL GUIDELINES FOR RESIDENTIAL USE. substructures or prevent adequate compaction of fill or contribute Contractor Applications & Registration Forms, Check Sheets, Booklets and Other Information, Board of Commissioner District Maps (PDF), 1 and 2 Family Residential 2015 Edition - Michigan Residential Code, Commercial and Industrial 2015 Edition - Michigan Building Code, Commercial and Industrial 2018 Edition - Michigan Electrical Code (2017 N.E.C. Il bando ha l'obiettivo di promuovere la crescita inclusiva, di rafforzare l'occupabilit e la permanenza in azienda. WebElectrical Nonmetallic Tubing (ENT): NEMA TC 13. and marked as being "sunlight resistant." An electrical contractor must secure a permit after completing the work by the next business day. I am running power from the house to the barn, about 200 feet. floor or floor joists across the face of rafters or studding, in. Inspectors cannot be involved in the planning of any work, or require any specific materials or equipment. Electrical drawings must include: Unless otherwise stated, all conductors are presumed to be copper. Underground PVC and ABS Plastic Utilities Duct: NEMA T6, Type I for encased burial in concrete, Type II for direct burial. SCMCCI - South Central Michigan Construction Code Inspections The governing utility may reconnect the electricity before the enforcing agency's approval after an electrical contractor's emergency repairs. 1045 Independence Boulevard Room 150 Charlotte MI 48813. Alteration, installation or repair of electrical equipment and wiring to generate and distribute electric current for the distribution system owned and operated by a power utility including meters. Anyone applying for a permit must be an electrical contractor licensed by a municipality or the Michigan Electrical Administrative Board. in Communications and English from Niagara University. the surface of the building, Where [300.5(A)], Where run across If payment has been made, they will authorize connection to the electrical supply. or other. While building permits may not be required for agricultural Our Amish built pole barns are offered in a variety of different sizes, and options for your horse barns. subject to physical damage, cables shall be protected by You must log in or register to reply here. Leave your name, phone number, permit number or address of the job site and type of inspection needed. WebP.O. Alteration, installation or repair of electrical equipment and wiring to generate and distribute telephone signals for the communication systems owned or operated by a telephone company. The splices or taps shall be made by, Backfill containing large rock, paving Installation, servicing or maintenance of residential and commercial lawn irrigation equipment, except any permanently wired connections that are more than 30 volts. The designer's responsibility is to select disconnection and overcurrent devices for a wiring system's coordination and interrupting capacity. Installation, maintenance or servicing of landscape lighting systems and equipment, except any permanently wired connections that are more than 30 volts. Pole barn wiring | The Building Code Forum 0000003246 00000 n WebWhat Do I Need To Get A Building Permit? Construction plans, drawings and specification reviews for 0000023900 00000 n installed under a building shall be in a raceway. Twenty-four inches for Type AC cable and 36 inches for interlocking Type MC cable where flexibility is necessary. Inspectors are limited to answering specific code questions that may be asked and determining if what has been completed, or what work is proposed to be done will meet the appropriate code requirements. R403.1.1 - Minimum size for concrete and masonry footings shall be as set forth in Table R403.1. Raceways may be unsupported where the raceway is not more than 900 millimeters (36 inches) long and remains in unbroken lengths (without coupling). This is a free download from the Adobe site. Pole Building Codes or where passing from the interior to the exterior of a building, Un bando rivolto alle imprese per sostenere il mercato del lavoro: partecipa entro il 18 gennaio. 0000001973 00000 n [300.5(H)], All conductors of the same circuit and, where present, the grounded conductor and all, Where direct buried conductors, Quality custom-built pole barns built to your satisfaction. BONUS PUBBLICITA: prorogato anche per il 2021! splice boxes. The alteration, construction, design, maintenance, modification and testing of electrical equipment and systems. You are using an out of date browser. sealed or plugged at either or both ends where moisture will It also covers existing electrical installations; those that do not comply with the Code's provisions can continue in use unless the installations present an imminent danger to the occupants of a building. Oct 24, 2001 / Electrical Conduit in Pole Barn #6 Molerj Platinum Member Joined Jul 18, 2001 Messages 610 Location Under streets, highways, roads, alleys, driveways and parking lots. Cover is defined as the shortest distance in inches (millimeters) measured between a point on the top surface of any direct-buried conductor, cable, conduit or other raceway and the top surface of finished. Welcome to Antrim County, MI A permit is not required to carry out any of these types of electrical work: Applicants must submit detailed plans and specifications for an electrical permit and wiring or alterations if an electrical system needs installation of equipment with more than 400 amperes for the service or feeder and if a structure's floor area is more than 3,500 square feet. The grounded conductor shall be insulated. 996. hb```f``e`a`6ee@ ^&(G @ m,H3E96_zkwk\~+C_ @0g0 Immediate opening for a part time plumbing inspector. The enforcing agency authorizes when an installation can be connected to the power supply. This officer shall administer and enforce the code when the use of electrical equipment or installations is found to be dangerous to life or property. Requirements for an ASME Boiler Pressure Vessel, North Carolina Septic Tank Installation Regulations, Michigan State University: Understanding the Construction Code Rules, Part 8, IAEI Michigan Chapter: 2017 Michigan Electric Code Part 8 Rules, Michigan.gov: Electrical Permit Information. 0000023922 00000 n Installed in accordance with listing requirements. ~OxP|`L 3SO C"/S`>*} 2/ In structures more than one floor above grade. About the Business BUSINESS Metal Supplier H & H Metal Products LLC 85 Harmon Road, Savannah, TN 38372 CALL US+1 (731) 925-1922 CALL US+1 (731) 925-1922 VIEW BUSINESS PROFILE Have a sheath. 0000008045 00000 n [310.10(D)], Where raceway or cable, protection shall be provided in the form of granular or selected material, suitable boards, suitable sleeves The MEC requires applicants to keep records of all electrical work, which they must periodically transmit to the electrical inspector. For 15 years our company has published content with clear steps to accomplish the how, with high quality sourcing to answer the why, and with original formats to make the internet a helpful place. Copyright 2023 Leaf Group Ltd. / Leaf Group Media, All Rights Reserved. A seal incorporating the physical protection characteristics of For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 degree = 0.0175 rad. shall be permitted to be spliced or tapped without the use of Electrical When approving electrical plans, the enforcing agency does not assume responsibility for the design or deviations from the drawings. Michigan Building Codes | UpCodes Delegate other qualified people or entities to administer and enforce the Code, such as police, fire and other enforcement agencies. We write helpful content to answer your questions from our expert network. endstream endobj startxref Electrical Package . 0000018801 00000 n R403.1.1 - Minimum size for concrete and masonry Numbering System . WebQ7: What size cement pad is needed for a pole barn? Insulated conductors and cables installed in such Call for a quote (810) 484-0970 . It is based on the National Electrical Code, which covers the installation of conductors and other electrical equipment in private and public structures. 3/4 Plywood Floor. WebMichigan pole barns built by Michigan Garage Builders Company. Type USE cable shall not be used inside buildings. Electrical Codes for Pole Barns FAQ : Mason County use with the cable insulation, shield, or other components. 0000001161 00000 n The barn is a private, non commercial use. services, feeders and, The allowable wiring methods for electrical installations shall be those listed in Table E3801.2. That may not be the correct answer, though Conduit below 10 ft, romex stapled along framing members. the top of floor joists, or run within 7 feet (2134 mm) of As used in this code, abbreviations of the wiringmethod types shall be as indicated in Table E3801.2. 19 0 obj <> endobj Read more about our editorial standards. y* 2N ;4{ .N endstream endobj 99 0 obj 272 endobj 66 0 obj << /Contents [ 77 0 R 82 0 R 84 0 R 86 0 R 88 0 R 90 0 R 92 0 R 94 0 R ] /Type /Page /Parent 60 0 R /Rotate 0 /MediaBox [ 0 0 612 792 ] /CropBox [ 0 0 612 792 ] /Resources 67 0 R >> endobj 67 0 obj << /ColorSpace << /Cs6 78 0 R >> /Font << /TT2 72 0 R /TT4 70 0 R /TT6 69 0 R /TT8 75 0 R /TT10 79 0 R >> /XObject << /Im1 97 0 R >> /ProcSet [ /PDF /Text /ImageC ] /ExtGState << /GS1 95 0 R >> >> endobj 68 0 obj << /Type /FontDescriptor /FontBBox [ -560 -376 1157 1031 ] /FontName /Arial-BoldItalicMT /Flags 96 /StemV 135.84 /CapHeight 718 /XHeight 515 /Ascent 905 /Descent -211 /ItalicAngle -15 /FontFamily (Arial) /FontStretch /Normal /FontWeight 700 >> endobj 69 0 obj << /Type /Font /Encoding /WinAnsiEncoding /BaseFont /Arial-BoldItalicMT /FirstChar 48 /LastChar 50 /Subtype /TrueType /FontDescriptor 68 0 R /Widths [ 556 0 556 ] >> endobj 70 0 obj << /Type /Font /Encoding /WinAnsiEncoding /BaseFont /Arial-BoldMT /FirstChar 32 /LastChar 146 /Subtype /TrueType /FontDescriptor 73 0 R /Widths [ 278 0 474 0 0 0 722 0 333 333 0 0 278 333 278 278 556 556 556 556 556 556 556 556 556 556 333 333 0 0 0 0 0 722 722 722 722 667 611 778 722 278 0 0 611 833 722 778 667 778 722 667 611 722 667 944 667 667 0 0 0 0 0 0 0 556 611 556 611 556 333 611 611 278 278 0 278 889 611 611 611 611 389 556 333 611 556 778 556 556 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 278 ] >> endobj 71 0 obj << /Type /FontDescriptor /FontBBox [ -665 -325 2000 1006 ] /FontName /ArialMT /Flags 32 /StemV 88 /CapHeight 718 /XHeight 515 /Ascent 905 /Descent -211 /ItalicAngle 0 /FontFamily (Arial) /FontStretch /Normal /FontWeight 400 >> endobj 72 0 obj << /Type /Font /Encoding /WinAnsiEncoding /BaseFont /ArialMT /FirstChar 32 /LastChar 146 /Subtype /TrueType /FontDescriptor 71 0 R /Widths [ 278 0 355 0 556 0 667 191 333 333 0 0 278 333 278 278 556 556 556 556 556 556 556 556 556 556 278 278 0 0 0 0 0 667 667 722 722 667 611 778 722 278 0 0 556 833 722 778 667 778 722 667 611 722 667 944 0 667 0 0 0 0 0 0 0 556 556 500 556 556 278 556 556 222 222 500 222 833 556 556 556 556 333 500 278 556 500 722 500 500 500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 222 ] >> endobj 73 0 obj << /Type /FontDescriptor /FontBBox [ -628 -376 2000 1010 ] /FontName /Arial-BoldMT /Flags 32 /StemV 138 /CapHeight 718 /XHeight 515 /Ascent 905 /Descent -211 /ItalicAngle 0 /FontFamily (Arial) /FontStretch /Normal /FontWeight 700 >> endobj 74 0 obj << /Type /FontDescriptor /FontBBox [ -558 -307 2000 1026 ] /FontName /TimesNewRomanPS-BoldMT /Flags 34 /StemV 136 /CapHeight 656 /XHeight 0 /Ascent 891 /Descent -216 /ItalicAngle 0 /FontFamily (Times New Roman) /FontStretch /Normal /FontWeight 700 >> endobj 75 0 obj << /Type /Font /Encoding /WinAnsiEncoding /BaseFont /TimesNewRomanPS-BoldMT /FirstChar 32 /LastChar 115 /Subtype /TrueType /FontDescriptor 74 0 R /Widths [ 250 0 0 0 0 0 0 0 0 0 0 0 250 0 0 0 500 0 0 0 500 0 0 0 500 500 0 0 0 0 0 0 0 722 0 722 722 667 0 0 778 389 0 0 667 944 722 778 0 0 722 0 667 0 0 0 0 0 0 0 0 0 0 0 0 500 0 444 0 0 0 500 556 278 0 0 0 0 556 0 0 0 0 389 ] >> endobj 76 0 obj 2422 endobj 77 0 obj << /Filter /FlateDecode /Length 76 0 R >> stream
Jasper County Courthouse Newton Iowa,
Who Is Nicholas Rockefeller Father,
Articles M
michigan electrical code for pole barns